Kitchen, bath & whole-home remodeling

Kitchen, bathroom and whole-home remodels: opening up floor plans, layout changes, cabinets, counters, tile, fixtures, lighting and finishes, managed start to finish.

Kitchens: $45,000 – $85,000 · Baths: $18,000 – $45,000

Kitchen with marble island and white cabinets

What’s included

  • Design consultation and a written scope
  • Demolition with dust and floor protection
  • Plumbing and electrical by licensed trades, with permits
  • Drywall, tile, cabinets, counters and fixtures
  • Final walkthrough and punch list

What drives the price

FactorLower endHigher end
LayoutSame footprintMoving walls or plumbing
CabinetsStockSemi-custom / custom
TileStandard ceramicLarge-format / stone
FixturesBuilder gradeDesigner / smart

Kitchen & Bath FAQ

Can I still use my house during the remodel?

Yes. We seal off the work area, protect floors, and keep a clean path in and out each day.

Who does the plumbing and electrical?

Licensed plumbers and electricians, under permit, scheduled and managed by us.

How long does a bathroom take?

Most full bathroom remodels take 3–5 weeks once materials are on site.

Kitchen remodels

Most kitchens we remodel land between $45,000 and $85,000. Refreshes that keep the layout start around $25,000. High-end kitchens and projects that move walls, plumbing or gas run $90,000 and up.

  • New cabinets, counters and backsplash
  • Layout changes and opening up walls (with engineering where needed)
  • Lighting, outlets and appliance circuits
  • Flooring, drywall and paint

Bathroom remodels

Full bathroom remodels usually run $18,000 to $45,000 and take 3–5 weeks once materials are on site.

  • Tub-to-shower conversions
  • Tile showers with glass
  • New vanities, toilets and fixtures
  • Waterproofing behind every tiled wall

Whole-home remodels

Opening up a floor plan, updating several rooms at once, or remodeling before you move in. We schedule the trades in order so the whole house is done once, not room by room.

Related: Home additions & ADUs · Basement finishing · Drywall & doors

How it works

Our 5-step process

  1. Free consultWe visit, measure, and talk through goals, timeline and budget.
  2. Written proposalItemized scope, price, schedule and a Maryland home improvement contract.
  3. Permits & scheduleWe pull permits and lock in your start date.
  4. BuildA clean, protected site and weekly updates until it’s done.
  5. Walkthrough & warrantyFinal walkthrough, punch list, and a 1-year workmanship warranty.